Leasing commercial space is rarely a single decision. It is a sequence of steps, each of which shapes cost, flexibility and risk for years to come. Whether you are an occupier taking new space or a landlord leasing a building, understanding the process helps you plan time realistically and avoid surprises at the documentation stage.
1. Define the requirement
Every good leasing outcome begins with a clear brief. Before viewing any property, an occupier should agree internally on:
- Size and growth: current headcount, expected growth over the lease term and the workplace model (assigned seating, hybrid, collaborative).
- Location: where employees live, client access, public transport and travel times.
- Budget: total occupancy cost, not just headline rent. This includes maintenance (CAM) charges, power, parking, fit-out and taxes.
- Timelines: when the current lease ends and how long fit-out will take.
- Building standards: specifications, certifications, power backup, safety and amenities.
2. Market scan and shortlisting
With a brief in hand, the next step is identifying buildings and spaces that fit. A structured comparison looks beyond rent to building quality, floor plate efficiency, the ratio of carpet to chargeable area, landlord reputation and the profile of existing tenants. A shortlist of three to five options keeps the process focused while preserving negotiating leverage.
3. Site visits and technical evaluation
Site visits should test how the space will actually work: natural light, column grid, ceiling heights, washroom and service provisions, lift waiting times and parking. For larger requirements, a technical review of MEP systems, structural load and fire safety compliance is worthwhile before commercial discussions progress.
4. Commercial negotiation
Key commercial terms are usually captured in a term sheet or Letter of Intent (LOI) before any lease is drafted. The terms that most influence long-term value include:
- Rent, the chargeable area it applies to, and CAM charges
- Lease tenure, lock-in period and renewal options
- Rent escalation, both the percentage and the frequency
- Security deposit
- Rent-free fit-out period and any landlord contribution to fit-out
- Exit, sub-letting and assignment rights
5. Due diligence on the property
Before committing, occupiers should confirm that the landlord has clear title and the authority to lease, and that the building holds the approvals needed for occupation, such as an occupation certificate and fire safety clearance. Confirming the permitted use of the premises is equally important.
6. Documentation and registration
Once terms are agreed, the lease deed is drafted and negotiated. In India, leases for a term exceeding one year generally need to be registered, with stamp duty and registration charges payable according to state rules. Clarifying early on who bears these costs avoids friction at signing.
7. Handover, fit-out and beyond
After signing, the space is handed over for fit-out, usually during an agreed rent-free period. A good leasing relationship continues after move-in, through coordination with the building management, tracking key lease dates and planning well ahead of renewal or exit.
Key takeaway
Most leasing problems arise not from the rent negotiated, but from terms that were not considered early enough. Starting with a clear brief and evaluating total occupancy cost gives occupiers and landlords alike a far stronger position.
Discuss your requirement with our team
Whether you are a landlord, occupier or investor, we can help you evaluate options and plan your next step.
Speak to Our TeamThis article provides general information only and does not constitute legal, tax or investment advice. Please seek professional advice for your specific situation.